Transparency requirements
Here you will find detailed information on our transmission network and services published in accordance with the legal requirements particularly Chapter 3 of Annex I of Regulation (EC) No 715/2009.
CMP chapter | Description | Link |
---|---|---|
3.1.2. (a) | A detailed and comprehensive description of the different services offered and their charges. | Services and charges |
3.1.2. (b) | The different types of transportation contracts available for these services. | Services and charges |
3.1.2. (c) 1. | Harmonised transportation contracts and other relevant documents. | GT&C main document |
3.1.2. (c) 2. | Specification of relevant gas quality parameters, including at least the gross calorific value and the Wobbe index, and the liability or costs of conversion for network users in case gas is outside these specifications. | GT&C Operating Manual Article 9.1 |
3.1.2. (c) 3. | Information on pressure requirements. | GT&C Operating Manual Article 9.2 |
3.1.2. (c) 4. | Procedure in the event of an interruption of interruptible capacity. | GT&C Operating Manual Article 3 |
3.1.2. (d) | Harmonized procedures applied when using the transmission system, including the defenition of key terms. | GT&C main document and exhibit A Operating Manual |
3.1.2. (e) | Provisions on capacity allocation, congestion management and anti-hoarding and reutilisation procedures. | GT&C Exhibit G |
3.1.2. (f) | Rules applicable for capacity trade on the secondary market vis-à-vis the transmission system operator. | GT&C main document Article 14 |
3.1.2. (g) | Rules on balancing and methodology for the calculation of imbalance charges. | GT&C main document Article 7 |
3.1.2. (h) | Flexibility and tolerance levels included in transportation and other services without seperate charge, as well as any flexibility offered in addition to this and the corresponding charges. | GT&C Exhibit G |
3.1.2. (i) | detailed description of the gas system of TSO and its relevant points of interconnection as well as the names of the operators of the interconnected systems or facilities. | About BBL |
3.1.2. (j) | Rules applicable for connection to the system operated by the transmission system operator. | GT&C Exhibit A Operating Manual |
3.1.2. (k) | Information on emergency mechanisms. | GT&C main document |
3.1.2. (l) | Procedures agreed upon by transmission system operators at interconnection points, of relevance for access of network users to the transmission system concerned, relating to interoperability of the network, agreed procedures on nomination and matching procedures and other agreed procedures that set out provisions in relation to gas flow allocations and balancing, including the methods used. | GT&C main document Article 6 |
3.1.2. (m) | Description of the methodology and process used to calculate the technical capacity. | Technical capacity |
3.3. (1) (a) | The technical capacity for flows in both directions. | ENTSOG |
3.3. (1) (b) | The total contracted firm and interruptible capacity in both directions. | ENTSOG |
3.3. (1) (c) | The nominations and re-nominations in both directions. | ENTSOG |
3.3. (1) (d) | The available firm and interruptible capacity in both directions. | ENTSOG |
3.3. (1) (e) | Actual physical flows. | ENTSOG |
3.3. (1) (f) | Planned and actual interruption of interruptible capacity. | ENTSOG |
3.3. (1) (g) | Planned and unplanned interruptions to firm services as well as the information on restoration of the firm services (in particular, maintenance of the system and the likely duration of any interruption due to maintenance). | PRISMA |
3.3. (1) (h) | Occurrence of unsuccessful, legally valid requests for firm capacity products with a duration of one month or longer including the number and volume of the unsuccessful requests. | CMP data section |
3.3. (1) (i) | In the case of auctions, where and when firm capacity products with a duration of one month or longer have cleared at prices higher than the reserve price. | CMP data section |
3.3. (1) (j) | Where and when no firm capacity product with a duration of one month or longer has been offered in the regular allocation process. | CMP data section |
3.3. (1) (k) | Total capacity made available through the application of the congestion-management procedures laid down in points 2.2.2., 2.2.3, 2.2.4 and 2.2.5 per applied congestion-management procedure. | CMP data section |
3.3. (4) | Publication measured values of the gross calorific value. | ENTSOG |
3.3. (5) | Publication available capacities, booked and technical capacities. | ENTSOG |
3.4. (1) | Publication aggregated amounts of capacities offered, and contracted on the secondary market. | PRISMA secondary Platform |
3.4. (2) | Harmonised conditions under which capacity transactions will be accepted. | GT&C |
3.4. (3) | Balancing services. | Not applicable |
3.4. (4) | further flexibility service of TSO. | Not applicable |
3.4. (5) | Amount of gas in the transmission system and the forecast. | Not applicable |
3.4. (6) | User-friendly instruments for calculating tariffs. | Tariffs |